New type 500 kg per hour automatic chicken feet paws production processing line

FOB Reference Price:Get Latest Price
$2,000.00 - $30,000.00 / Set | 1 Set/Sets Chicken Feet Processing Line (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Model Number:
HL-7
Brand Name:
HL
Place of Origin:
Henan, China
Name:
chicken feet processing
Machine material:
stainless steel
Capacity:
500kg/h
Usage:
chicken feet /chicken paws
worker:
9 person
Quitity:
5 sets
area:
100 square meters
Application:
chicken feet peeling machine
processing:
chicken feet cutting machine
Product name:
chicken Paws Production line
After-sales Service Provided:
Engineers available to service machinery overseas
Type:
Meat Processing Machinery
Supply Ability
Supply Ability:
152 Set/Sets per Week chicken feet processing line
Packaging & Delivery
Packaging Details
Standard export carton packing, fit for multiple handing and long distance marine shipping.
Port
Ningbo / Qingdao
Lead Time :
7 days
Video Description

New type 500 kg per hour automatic  chicken feet paws production processing line

Product Description

The chicken feet processing line is mainly consists of 6 machine, the scalding machine,peeling machine,pre-cooking machine, water removing machine, cutting machine. Also with belt conveyor and vacuum packing machine.
All machine's material is stainless steel.

Apply of line

Parts of chicken feet line

PART F: TECHNICAL SERVICE

1. Design for production line flow and equipment layout freely according to the site.

2. Technical documentary: During 5 days after receiving the advance deposit, the seller will provide operating instruction and all relative drawings.

3. During the operation, we can offer the technology service freely if the user

needs to adjust the layout and application.

More video please copy it

Machine

Video

Chicken feet peeling machine

https://youtu.be/Ba3OcQdLe60

Automatic weight sorting machine

https://youtu.be/Y_bqelh8P8I

Chicken feet cutting machine

https://youtu.be/QItL4QPu1vg

Chicken feet cutting machine

https://youtu.be/9HJvQpVMeuE

chicken feet blanching machine

https://youtu.be/34FVdTjr4EU

chicken feet production line

https://youtu.be/H5qDmKqLpwM

CE
Example of customer
Packaging & Shipping

 PACKAGE:

Standard export carton packing, fit for multiple handing and long distance marine shipping.

DELIVERY TIME:

3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

Our Services

 

1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer’s safety, travel expense, accommodation abroad. And shall pay the salary for the engineer, 150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.

2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.

3. If the equipment appear the equipment failure because of improper handling of user, we are in charge of maintenance, and collect the appropriate cost.

4. We offer the components with favorable price, perdurable maintenance. After quality assurance date, if the equipment needs to be repaired, we only collect the cost price.

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

Contact Now